UTV AG successfully expands to Portugal 🇵🇹 >> read the story

Suchen
Suchen

Project Franke

Project details

In 2009, the biogas plant of Franke Transport & Biogas in Borchen made the decision to no longer spread the fermentation residues directly as fertilizer, as had previously been the case. Instead, the company opted to process the fermentation residues into high-quality compost. The company was looking for a composting process that would save as much energy as possible, deliver a good quality composted product and fulfil the requirements for the lowest possible emissions. The choice fell on our efficient UTV systems. Our Gore Cover laminate membrane cover enables us to compost around 4,000 tonnes of finished fermentation residue every year on our aerated windrows. This reduces the composting time from up to 3 months to approximately 4 weeks compared to conventional processes. Furthermore, the energy requirement is reduced by 7,500 kWh per annum, as the material no longer needs to be moved.

Project details

In 2009, the biogas plant of Franke Transport & Biogas in Borchen made the decision to no longer spread the fermentation residues directly as fertilizer, as had previously been the case. Instead, the company opted to process the fermentation residues into high-quality compost. The company was looking for a composting process that would save as much energy as possible, deliver a good quality composted product and fulfil the requirements for the lowest possible emissions. The choice fell on our efficient UTV systems. Our Gore Cover laminate membrane cover enables us to compost around 4,000 tonnes of finished fermentation residue every year on our aerated windrows. This reduces the composting time from up to 3 months to approximately 4 weeks compared to conventional processes. Furthermore, the energy requirement is reduced by 7,500 kWh per annum, as the material no longer needs to be moved.

Composting plant

Franke

Location

Borchen, Germany

Material

Fermentation residues

Capacity per year

4.000 t/a

Commissioning

2009

Would you like to learn more about our project steps?

Uwe Schlick is your ideal contact person.

Phone: +49 7161 5079705
E-mail: uwenoSpam@utvag.de

Other projects.

01 / 10

This might also interest you

GORE® Cover

Windrow coverage – technically up to date & easy to handle.

LEARN MORE

Process steps

UTV AG can offer complete treatment and disposal solutions for a various waste streams.

LEARN MORE

System components

Innovative and simply good – take a look at the different design variants.

LEARN MORE