UTV AG successfully expands to Portugal 🇵🇹 >> read the story

Suchen
Suchen

Project LACSD

Project details

LACSD – that stands for Los Angeles County Sanitation District. And it stands for a real showcase project: a multi-year construction project in California and our largest project to date: 72 windrows with a total capacity of 200,000 tonnes per year have been completed, the control technology installed and two PWM 13 mobile wrapping machines are ready for use. 6,768 meters of aeration channels have been laid, 72 radial fans and 72 distribution cabinets installed. The total area of the first construction phase is an impressive 65,800 m². Quality and logistics made in the German state of Baden-Württemberg. A project of superlatives: 1,000,000 tonnes of sewage sludge and green waste have been processed into high-quality compost since the end of the last construction phase in 2014.

Project details

LACSD – that stands for Los Angeles County Sanitation District. And it stands for a real showcase project: a multi-year construction project in California and our largest project to date: 72 windrows with a total capacity of 200,000 tonnes per year have been completed, the control technology installed and two PWM 13 mobile wrapping machines are ready for use. 6,768 meters of aeration channels have been laid, 72 radial fans and 72 distribution cabinets installed. The total area of the first construction phase is an impressive 65,800 m². Quality and logistics made in the German state of Baden-Württemberg. A project of superlatives: 1,000,000 tonnes of sewage sludge and green waste have been processed into high-quality compost since the end of the last construction phase in 2014.

Composting plant

LACSD

Location

Kettleman City, California (USA)

Material

Green waste, sewage sludge

Capacity per year

200.000 t/a

Special Fact

Number of windrows: 72

Commissioning

2014

Would you like to learn more about our project steps?

Thomas Schlien is your ideal contact person.

Phone: +49 7223 8001505
E-mail: thomasnoSpam@utvag.de

Other projects.

01 / 10

This might also interest you

GORE® Cover

Windrow coverage – technically up to date & easy to handle.

LEARN MORE

Process steps

UTV AG can offer complete treatment and disposal solutions for a various waste streams.

LEARN MORE

System components

Innovative and simply good – take a look at the different design variants.

LEARN MORE