UTV AG successfully expands to Portugal 🇵🇹 >> read the story

Suchen
Suchen

UTV on tour – Oman

In the middle of the desert, the heat burns onto the GORE® Cover, which covers the camel dung. Despite the intense heat, the system does not lose its effectiveness. This is the result of a precise requirements analysis, which is confirmed by the excellent compost results.

Heat and drought

Hot temperatures heat up the compost

Hot temperatures and innovative composting – just right for the UTV system.

We are pleased to announce the successful commissioning of our composting plant in Salalah, in the south of Oman. Set against the stunning backdrop of this unique location, the plant was commissioned in 2023.

Before construction began, we carried out a thorough site inspection to familiarise ourselves with the local conditions and climate. Based on these findings, we developed a bespoke plant design to make the most of the challenging environmental conditions and provide efficient composting.

Our composting plant has been specially designed to cope with the high temperatures and special requirements of the site. With an impressive annual capacity of 45,000 tonnes, it turns camel dung into high quality compost. This innovative solution is not only environmentally friendly, but also contributes to the sustainable use of resources in the region.

The successful commissioning of this plant is another milestone and underlines our leading position in the field of environmental technology. We are proud to contribute to Oman's sustainable development and look forward to delivering more innovative projects that have a positive impact on the environment and the community.

Industry solution

Industrial
composting.

With the UTV system, organic materials are composted under controlled conditions. Find out more about the use of our system in various industries – what requirements we fulfil and what advantages result from using the system for composting.