UTV AG successfully expands to Portugal 🇵🇹 >> read the story

Suchen
Suchen

Project Ordu authorities

Project details

Our biological residual waste drying plant in Ordu, on the eastern Black Sea coast of Turkey, composts 6,000 tonnes of residual waste per year. The special feature: the residual waste must not be larger than 80 mm. The aim is to dry the material to 0-80 mm with less than 25% moisture within 42 days. The plant has been in operation since 2016.

Project details

Our biological residual waste drying plant in Ordu, on the eastern Black Sea coast of Turkey, composts 6,000 tonnes of residual waste per year. The special feature: the residual waste must not be larger than 80 mm. The aim is to dry the material to 0-80 mm with less than 25% moisture within 42 days. The plant has been in operation since 2016.

Composting plant

Ordu authorities

Location

Ordu, Turkey

Material

Residual waste

Capacity per year

6.000 t/a

Special Fact

Residual waste < 80 mm

Commissioning

2016

Would you like to learn more about our project steps?

Uwe Schlick is your ideal contact person.

Phone: +49 7161 5079705
E-mail: uwenoSpam@utvag.de

Other projects.

01 / 10

This might also interest you

GORE® Cover

Windrow coverage – technically up to date & easy to handle.

LEARN MORE

Process steps

UTV AG can offer complete treatment and disposal solutions for a various waste streams.

LEARN MORE

System components

Innovative and simply good – take a look at the different design variants.

LEARN MORE