UTV AG successfully expands to Portugal 🇵🇹 >> read the story

Suchen
Suchen

Project Linz AG

Project details

As a multi-utility provider, Linz AG is responsible for energy supply, public transport and municipal services in Linz, Upper Austria. Our mechanical-biological waste treatment plant with an annual volume of approx. 45,000 tonnes was commissioned in 2007 and operated until 2012. Since the construction of the residual waste treatment plant (RABA), the MBT plant has served as an outage plant for planned (revision) and unplanned shutdowns. Our plants are flexible and can be utilized as required.

Project details

As a multi-utility provider, Linz AG is responsible for energy supply, public transport and municipal services in Linz, Upper Austria. Our mechanical-biological waste treatment plant with an annual volume of approx. 45,000 tonnes was commissioned in 2007 and operated until 2012. Since the construction of the residual waste treatment plant (RABA), the MBT plant has served as an outage plant for planned (revision) and unplanned shutdowns. Our plants are flexible and can be utilized as required.

Composting plant

Linz AG

Location

Linz, Austria

Material

Residual waste MBT

Capacity per year

45.000 t/a

Commissioning

2007

Would you like to learn more about our project steps?

Thomas Schlien is your ideal contact person.

Phone: +49 7223 8001505
E-mail: thomasnoSpam@utvag.de

Other projects.

01 / 10

This might also interest you

GORE® Cover

Windrow coverage – technically up to date & easy to handle.

LEARN MORE

Process steps

UTV AG can offer complete treatment and disposal solutions for a various waste streams.

LEARN MORE

System components

Innovative and simply good – take a look at the different design variants.

LEARN MORE