UTV AG goes wireless – We take temperature monitoring to the next level with our wireless system. 🌡️ Click here for the Story. ☀️❄️

Suchen
Suchen

Project AWG Calw

Project details

At the Simmozheim and Walddorf waste disposal facilities, Abfallwirtschaft Landkreis Calw, or AWG for short, processes green waste into high-quality compost. Our composting process was installed in Simmozheim in 2014. This is our cost-effective UTV system, in which the green waste to be composted is aerated depending on oxygen and temperature and covered with a GORE® Cover to ensure an optimized composting process. Quality-assured compost is produced in just 4 weeks of intensive composting and 2 weeks of secondary composting. Every year, approx. 4,000 tonnes of non-woody green waste are processed into quality-assured compost at a process temperature of approx. 60 – 70 degrees. The aim is to process all garden waste from the district of Calw in the district to close the cycle.

Project details

At the Simmozheim and Walddorf waste disposal facilities, Abfallwirtschaft Landkreis Calw, or AWG for short, processes green waste into high-quality compost. Our composting process was installed in Simmozheim in 2014. This is our cost-effective UTV system, in which the green waste to be composted is aerated depending on oxygen and temperature and covered with a GORE® Cover to ensure an optimized composting process. Quality-assured compost is produced in just 4 weeks of intensive composting and 2 weeks of secondary composting. Every year, approx. 4,000 tonnes of non-woody green waste are processed into quality-assured compost at a process temperature of approx. 60 – 70 degrees. The aim is to process all garden waste from the district of Calw in the district to close the cycle.

Composting plant

AWG Calw

Location

Simmozheim, Germany

Material

Green waste

Capacity per year

4.000 t/a

Commissioning

2014

Would you like to learn more about our project steps?

Uwe Schlick is your ideal contact person.

Phone: +49 7161 5079705
E-mail: uwenoSpam@utvag.de

Other projects.

01 / 10

This might also interest you

GORE® Cover

Windrow coverage – technically up to date & easy to handle.

LEARN MORE

Process steps

UTV AG can offer complete treatment and disposal solutions for a various waste streams.

LEARN MORE

System components

Innovative and simply good – take a look at the different design variants.

LEARN MORE